Construction Office Coordinator
Kansas Department of Transportation (KDOT)
Date: 15 hours ago
City: Wichita, KS
Contract type: Full time

This job was posted by https://www.kansasworks.com : For more
information, please see: https://www.kansasworks.com/jobs/13302047
Page 1 of 6
DA 281-2 State of Kansas - Department of Administration
Rev. 4-13 OFFICE OF PERSONNEL SERVICES
Position Description
Read each heading carefully before proceeding. Make statements simple,
brief, and complete. Be certain the form is
signed. Send the original to the Office of Personnel Services.
CHECK ONE: NEW POSITION EXISTING POSITION
Agency
Number
276
Part 1 - Items 1 through 12 to be completed by department head or
personnel office.
1\. Agency Name
KDOT
Kansas Department of Transportation
9\. Position No.
K0241507 /
05-05-08-800
10\. Budget Program Number
9917
2\. Employee Name (leave blank if position vacant)
11\. Present Class Title (if existing position)
Engineering Technician (UNCL/NE)
Construction Office Coordinator (ETA)
(working title)
3\. Division
Field Operations
12\. Proposed Class Title
4\. Section
District Five
For 13. Allocation
5\. Unit
Construction Area Five
Use
14\. Effective Date Position
Number
6\. Location (address where employee works)
City: Wichita County: Sedgwick
By
15\. By Approved
7\. (circle appropriate time)
Full time X Perm. X Inter.
Part time Temp. %
Personnel
16\. Audit
Date:
By:
By:
8\. Regular hours of work: (circle appropriate time)
FROM: 8:00 AM TO: 4:30 PM
Office
17\. Audit
By:
PART II - To be completed by department head, personnel office, or
supervisor of the position.
18\. If this is a request to reallocate a position, briefly describe the
reorganization, reassignment of work, new function added by law or
other factors which changed the duties and responsibilities of the
Position:
Assists construction personnel in executing the continuous flow of
paperwork and documentation necessary to administer contracts.
19\. Who is the supervisor of this position? (Person who assigns work,
gives directions, answers questions and is directly in charge)?
Who evaluates the work of an incumbent in this position?
Name Title Position \#
Hideki Fields Construction Engineer Assoc (EA III) K0227073 /
05-05-08-803
20\. a) How much latitude is allowed for the employee in completing the
work? b) What kinds of instructions, methods, and guidelines
are given to the employee in this position to help do the work? c) State
How And In What Detail Assignments Are Made.
a\) Sufficient latitude to complete limited technical duties following
specified standard practices and procedures.
b\) Detailed instructions are given either verbally or written by
supervisors.
c\) Formal guidelines are provided by manual, specifications, SOMs,
plans and contracts.
Page 2 of 6
21\. Describe the work of this position using the page or one additional
page only.
No. % E or M
Work assignments are received with general instructions and objectives
outlined by a professional/technician
supervisor who reviews work for results obtained.
25 E
Coordinate preparation and submission of weekly construction reports,
notification of working days charged,
log of pile driving and weekly surfacing reports. Collect and transfer
data from source documents to update
the Construction Management System (CMS) for the review and generation
of contract reports. Coordinate
finalization of projects through navigation in CMS.
20 E
Maintain a system of office management that insures that all necessary
forms and reports are submitted.
Prepare documents using Microsoft Office software and KDOT Forms
Warehouse for the Construction r
information, please see: https://www.kansasworks.com/jobs/13302047
Page 1 of 6
DA 281-2 State of Kansas - Department of Administration
Rev. 4-13 OFFICE OF PERSONNEL SERVICES
Position Description
Read each heading carefully before proceeding. Make statements simple,
brief, and complete. Be certain the form is
signed. Send the original to the Office of Personnel Services.
CHECK ONE: NEW POSITION EXISTING POSITION
Agency
Number
276
Part 1 - Items 1 through 12 to be completed by department head or
personnel office.
1\. Agency Name
KDOT
Kansas Department of Transportation
9\. Position No.
K0241507 /
05-05-08-800
10\. Budget Program Number
9917
2\. Employee Name (leave blank if position vacant)
11\. Present Class Title (if existing position)
Engineering Technician (UNCL/NE)
Construction Office Coordinator (ETA)
(working title)
3\. Division
Field Operations
12\. Proposed Class Title
4\. Section
District Five
For 13. Allocation
5\. Unit
Construction Area Five
Use
14\. Effective Date Position
Number
6\. Location (address where employee works)
City: Wichita County: Sedgwick
By
15\. By Approved
7\. (circle appropriate time)
Full time X Perm. X Inter.
Part time Temp. %
Personnel
16\. Audit
Date:
By:
By:
8\. Regular hours of work: (circle appropriate time)
FROM: 8:00 AM TO: 4:30 PM
Office
17\. Audit
By:
PART II - To be completed by department head, personnel office, or
supervisor of the position.
18\. If this is a request to reallocate a position, briefly describe the
reorganization, reassignment of work, new function added by law or
other factors which changed the duties and responsibilities of the
Position:
Assists construction personnel in executing the continuous flow of
paperwork and documentation necessary to administer contracts.
19\. Who is the supervisor of this position? (Person who assigns work,
gives directions, answers questions and is directly in charge)?
Who evaluates the work of an incumbent in this position?
Name Title Position \#
Hideki Fields Construction Engineer Assoc (EA III) K0227073 /
05-05-08-803
20\. a) How much latitude is allowed for the employee in completing the
work? b) What kinds of instructions, methods, and guidelines
are given to the employee in this position to help do the work? c) State
How And In What Detail Assignments Are Made.
a\) Sufficient latitude to complete limited technical duties following
specified standard practices and procedures.
b\) Detailed instructions are given either verbally or written by
supervisors.
c\) Formal guidelines are provided by manual, specifications, SOMs,
plans and contracts.
Page 2 of 6
21\. Describe the work of this position using the page or one additional
page only.
No. % E or M
Work assignments are received with general instructions and objectives
outlined by a professional/technician
supervisor who reviews work for results obtained.
25 E
Coordinate preparation and submission of weekly construction reports,
notification of working days charged,
log of pile driving and weekly surfacing reports. Collect and transfer
data from source documents to update
the Construction Management System (CMS) for the review and generation
of contract reports. Coordinate
finalization of projects through navigation in CMS.
20 E
Maintain a system of office management that insures that all necessary
forms and reports are submitted.
Prepare documents using Microsoft Office software and KDOT Forms
Warehouse for the Construction r
How to apply
To apply for this job you need to authorize on our website. If you don't have an account yet, please register.
Post a resume